1 Purpose and objectives

The aim is to consolidate the theoretical knowledge and the development of students' autonomy in solving the problems, the acquisition of practical skills for working with technical literature, the normative and technical conditions in the computer. This calculation-graphic work number 2 is the sequel RGR number 1 on the subject "Power stations and substations"

Tasks RGR:

1) selection of the type, number and power transformers;

2) the calculation of annual energy losses in transformers.

2 Initial data

Student card number: 28

Type of fuel: fuel oil;

The number and power generators is 5 / 63 MW; 15 / 6 MW;

Quantity and power lines load on the generator voltage, MW: 16/6;

Consumption per SN% of Rust. gene .: 7%;

RUSN Rated voltage, KV 35;

The number of lines and the power loads RUSN, MW: 2/45;

Continuation of loads, winter-summer: 160/205;

Rated voltage lines to the system, KV 110;

Number parish lines and their length, km: 2/90.

In accordance with the given power in the initial data, we take to installation four turbogenerators of the type TVS-81U and one turbo-generator of the type TVF-9-2U.

Table 1 - Main technical characteristics

Type of turbogenerator

ТВФ-9-2У

ТВС-81У

Nominal rot. frequency, rpm

3000

3000

Nominal power

Full, МV·А

76,45

40

Active, MW

54

35

Nom. voltage, kV

8,3

8,3

cosφном

0,9

0,9

Nominal current, kA

6,89

4,11

Table 2 - Balance of power for normal version 1:

Defined parameter

Period year/h

0-8

8-18

18-24

1 Generation of power G-1 and G-2, MW

Winter

Sum

22.4

17.2

24

19.2

22.4

17.2

2 Load G-1 and G-2, MW

Winter

Sum

1.374

1.204

1.44

1.2672

1.374

1.204

3 Load generator G-3, MW

Winter

Sum

1.8048

1.5744

1.92

1.6896

1.8048

1.5744

4 10 kV load, MW

Winter

Sum

19

13.1

19

13.1

19

13.1

5 Loading of T-1 and T-2, MW (total)

Winter

Sum

2.2464

3.0192

4.56

5.3328

2.2464

3.0192

6 Loading of each of the transformers T-1 and T-2, MW

Winter

Sum

1.1232

1.5096

2.28

2.6674

1.1232

1.5096

7 Load of 35 kV, MW

Winter

Sum

4.8

3.6

6

4.2

4.8

3.6

8 Loading of 10 kV windings T-3, MW

Winter

Sum

30.195

30.425

30.08

30.3104

30.195

30.425

9 Loading of 35 kV winding T-3, MW

Winter

Sum

2.5536

0.5808

1.44

–1.1328

2.5536

0.5808

10 Loading of windings 110 kV T-3, MW

Winter

Sum

27.641

29.844

28.64

31.4432

27.641

29.844

Table 3 - Balance of power for the normal mode of option 2:

Defined parameter

Period year/h

0-8

8-18

18-24

1 Generation of power G-1 and G-2, MW

Winter

Sum

21.6

16.8

24

19.2

21.6

16.8

2 Load G-1 and G-2, MW

Winter

Sum

1.3536

1.1808

1.44

1.2672

1.3536

1.1808

3 Load generator G-3, MW

Winter

Sum

1.8048

1.5744

1.92

1.6896

1.8048

1.5744

4 10 kV load, MW

Winter

Sum

18

12.6

18

12.6

18

12.6

5 Loading of T-1 and T-2, MW (total)

Winter

Sum

2.8764

3.3192

4.53

5.3124

2.8764

3.3192

6 Loading of each of the transformers T-1 and T-2, MW

Winter

Sum

1.6232

1.5096

2.28

2.6674

1.6232

1.5096

7 Load of 35 kV, MW

Winter

Sum

4.4

3.1

5

3.81

4.4

3.1

8 Power flow from 110 kV each of the transforms. T-1 and T-2 at 35 kV, MW

Winter

Sum

1.3267

0.3012

0.72

-0.5664

1.3267

0.3012

9 Loading of 35 kV windings of each of the transformers T-1 and T-2, MW

Winter

Sum

2.5

1.7

3

2.4

2.5

1.7

Figure 1 - Block diagram of a thermal power plant for 1 version

Figure 2 - Block diagram of a thermal power plant for 2 options

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]