3.4.
Course
designModule 1.4-2.2-3.4 "Methodological support
Organization course design"
The content of the activity
The actions of the head of the course project
The
study of the Federal state educational standard and the Basic
professional educational program
The
study schedule of the educational process
The
study of the curriculum
1.4. Methodological support
Studying
of normative documents on methodological support of the course
design
The
study of the rights and duties of the head of the course work
The
study requirements for graduates
The
study's General recommendations for course projects
The
study requirements for bibliographic support, Internet resources and
resources information and educational environment
The
study of the requirements for scientific style of speech
A
study of the requirements to review
Preparation
of the work program Professional module, Interdisciplinary course,
discipline
Drafting
and approval of the calendar-thematic plan
Scheduling
consultations
Development
of guidelines for preparation of course projects
The
preparation of subject course projects
The
approval of the methodological guidelines for preparation of course
projects
Figure 2. Algorithm for the development of the content of the module 1.4.-2.2.-3.4. "Methodical support of organization of course design"
Fond of learning tools needs to contain didactic material, adequate organizational form of learning and allows the student to reach the required level of learning and provide the teacher the opportunity at any time to check the effectiveness of their work, to self-monitor themselves and adjust their learning activities.
For the introduction of the 3D model of Fond of learning tools can be applied project technology: developed a conceptual model of the project (table 2), it builds a matrix of distribution of responsibility (table 3), defines the logic of the sequencing sequence work, schedule the project plan (table 4), built a Gantt chart (figure 3) using the program MS Projekt, identified the costs of implementation of the project.
Table 2. Conceptual model of project implementation
The project "Implementation of 3D model Fond of learning tools |
|
1. Organizational phase
|
1.1. Definition of persons responsible for the implementation of 3D models |
1.2. Timing of the introduction of 3D models |
|
1.3. The Establishment of performance criteria |
|
2. Analysis of the content of Fond of learning tools
|
2.1. Definition of the module names that reflect the content of each element |
2.2. Identification of gaps in the Fund of normative and methodological support, teaching tools and control |
|
3. The Introduction of new d |
3.1. The Development of teaching tools |
3.2. Acquisition of natural remedies |
|
3.3 The Acquisition and implementation of technical means |
|
4. Introduction to 3D model the new elements to reflect the innovations of the educational process |
|
5. The determination of the cost of implementing the project |
|
6. Evaluation of the effectiveness of implementation of 3D models |
|
Project management involves the allocation of responsibility for project operations (table 3). Where “I” the Implementation, “R” responsibility, “K” – control.
Table 3. Matrix of responsibility allocation
Work on the project "the introduction of the 3D model of Fond of learning tools
|
Performers |
|||
Director |
Deputy Director on educational work |
Heads of educational departments |
Teachers |
|
1. Organizational phase |
K |
R |
- |
- |
1.1. Definition of persons responsible for the implementation of 3D models |
K |
R |
I |
I |
1.2. Timing of the introduction of 3D models |
K |
R |
I |
- |
1.3. The Establishment of performance criteria |
K |
R |
I |
- |
2. Analysis of the content of Fond of learning tools |
K |
R |
I |
I |
2.1. Definition of the module names that reflect the content of each element |
K |
R |
I |
I |
2.2. Identify gaps, Fund, regulatory support and training tools |
K |
R |
I |
- |
3. The Introduction of new documentation, training and supervision |
K |
R |
I |
I |
3.1. The Development of teaching tools |
K |
R |
- |
I |
3.2. Acquisition of natural remedies |
К, R |
I |
- |
- |
3.3. The Acquisition and implementation of technical means |
К, R |
I |
I |
I |
4. Introduction to 3D model the new elements to reflect the innovations of the educational process |
К |
R |
I |
- |
5. The determination of the cost of implementing the project |
К, R |
I |
- |
- |
6. Evaluation of the effectiveness of implementation of 3D models |
К |
R |
I |
- |
The calculation of the project was implemented in the program MS Project. Project schedule for 120 days, are shown in table 4.
Table 4. Project schedule
Operation |
Duration |
Beginning |
The end |
Project implementation the 3D model of Fond of learning tools |
120 days |
Mon 16.01.17 |
Fri 30.06.17 |
1. Organizational phase |
8 days |
Mon 16.01.17 |
Wed 25.01.17 |
1.1.Definition of persons responsible for the implementation of 3D models |
2 days |
Mon 16.01.17 |
Tue 17.01.17 |
1.2. Timing of the introduction of 3D models |
1 day |
Wed 18.01.17 |
Wed 18.01.17 |
1.3. The Establishment of performance criteria |
5 days |
Thu 19.01.17 |
Wed 25.01.17 |
2. Analysis of the content of Fond of learning tools |
30 days |
Thu 26.01.17 |
Wed 08.03.17 |
2.1. Definition of the module names that reflect the content of each element |
15 days |
Thu 26.01.17 |
Wed 15.02.17 |
2.2.Identify gaps, Fund, regulatory support and training tools |
15 days |
Thu 16.02.17 |
Wed 08.03.17 |
3. The Introduction of new documentation, training and supervision |
58 days |
Thu 09.03.17 |
Mon 29.05.17 |
3.1. The Development of teaching tools |
41 days |
Thu 09.03.17 |
Thu 04.05.17 |
3.2. Acquisition of natural remedies |
7 days |
Fri 05.05.17 |
Mon 15.05.17 |
3.3. The Acquisition and implementation of technical means |
10 days |
Tue16.05.17 |
Mon 29.05.17 |
4. Introduction to 3D model the new elements to reflect the innovations of the educational process |
10 days |
Tue 30.05.17 |
Mon 12.06.17 |
5. The determination of the cost of implementing the project |
7 days |
Mon 12.06.17 |
Tue 20.06.17 |
6. Evaluation of the effectiveness of implementation of 3D models |
8 days |
Wed 21.06.17 |
Fri 30.06.17 |
Figure 3 shows a Gantt chart, where the black color indicates those critical operations that need to pay most attention to: 1.5. "The establishment of performance criteria", 2.2. "Identify gaps, Fund, regulatory support and training"; 3.1. "Instructional resources"; 6. "Evaluation of the effectiveness of the implementation of 3D models".