- •Предисловие
- •Содержание
- •Introduction p. 3
- •Innovation (Part I) p. 80
- •Civil Engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Construction Processes
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part III)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Fundamentals of Reinforced Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Using Concrete Formwork in Construction
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Glass Fiber Reinforced Concrete (gfrc)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •When Stress Is Good:
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Post-Tensioned Slabs
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Why Does Concrete Crack?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Working with Versatile Lightweight Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Fly Ash Concrete?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete Mix with Fly Ash
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Designs – Flexibility and Innovation (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Advantages (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Tilt-up Construction? (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Precast Concrete, Tilt-up Construction and Tiltwall: What's the Difference in These Terms? (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Environmental engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete: a Sustainable Construction Material that can Help Fight Climate Change
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Sustainable Building
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Final tests test I
- •Test II
- •Test III
- •Test IV
- •References to video files
- •The Concrete Construction Process (Part 3)
- •When Stress Is Good:
- •Flexibility and Innovation
- •What's the Difference in These Terms?
- •That can Help Fight Climate Change
- •1. “Sustainable Home”
- •2. “Innovations in Green Home Building”
- •(Heating, ventilating and air conditioning)
- •Glossary of construction terms Construction Terms Beginning With Letter a
- •Construction Terms Beginning With Letter b
- •Construction Terms Beginning With Letter c
- •Construction Terms Beginning With Letter d
- •Construction Terms Beginning With Letter e
- •Construction Terms Beginning With Letter f
- •Construction Terms Beginning With Letter g
- •Construction Terms Beginning With Letter h
- •Construction Terms Beginning With Letter I
- •Construction Terms Beginning With Letter j
- •Construction Terms Beginning With Letter k
- •Construction Terms Beginning With Letter l
- •Construction Terms Beginning With Letter m
- •Construction Terms Beginning With Letter n
- •Construction Terms Beginning With Letter o
- •Construction Terms Beginning With Letter p
- •Construction Terms Beginning With Letter q
- •Construction Terms Beginning With Letter r
- •Construction Terms Beginning With Letter s
- •Construction Terms Beginning With Letter t
- •Construction Terms Beginning With Letter u
- •Construction Terms Beginning With Letter V
- •Construction Terms Beginning With Letter w
- •Construction Terms Beginning With Letter y
- •Construction Terms Beginning With Letter z
- •Библиография
- •Электронные ресурсы
Test III
Select the best possible answer out of the choices from the list to the statements (multiple choice):
1. For low load applications the quality of the concrete is determined by such factors as … .
a. cement type, aggregate size and type
b. amount of water, mineral and chemical admixtures
c. resistance to freezing or wear resistance
d. proportions of the ingredients, that will make up the concrete
2. Roads must be able … .
a. to withstand the slump
b. to be exposed to severe conditions
c. to support relatively small loads
d. to withstand the corrosive effects of salt
3. Underground applications must be able … .
a. to resist freezing
b. to resist the ingress of moisture and aggressive species from the soil
c. to generate the correct air void system
d. to break up agglomerated clusters of cement particles
4. Ready-mix plants have a wide variety of aggregate and cement … .
a. that are stored in severe conditions
b. that are stored underground
c. that are stored under controlled conditions
d. that are stored in concrete mixing trucks
5. Most concrete is batched and mixed in a central location called … .
a. an industrial enterprise
b. a ready-mix plant
c. a one-stop shop
d. a fixed structure
Test IV
Complete the sentences by filling in the correct word that fits a statement (gap fill). Choose the appropriate words from the word bank given below.
A. tendency B. durability C. concrete D. distributes
E. corrosive F. cold-weather G. performed H. ingredients
I. admixtures J. sprayed K. stored L. transport
1. The first and most important step in the process is to determine the …… .
2. The cost of …… scales rather closely with its strength.
3. Concrete can be poured, pumped, and even …… into place.
4. Workability is usually defined by the slump, which is the …… for the fresh concrete
5. In …… locations the concrete must be able to resist freezing.
6. Weak concrete almost always lacks …… .
7. Roads must be able to withstand the …… effects of salt.
8. Concrete mixing trucks can be used to …… already-mixed concrete.
9. The mixing can actually be …… by the truck as it is traveling to the site.
10. Mixing …… the aggregate evenly throughout the cement paste.
UNIT 4
The Concrete Construction Process (Part II)
Read, translate the following text and be ready to fulfil the tests:
Placing. Once the concrete has been adequately mixed, it must be placed into the formwork that defines its final position and shape. If the concrete is to be reinforced, the steel rebar must already be in place so the concrete can flow around it. If the concrete mixing truck can be located close to (and higher than) the site, then the concrete can be poured directly into the forms. In cases where this is not possible, the concrete can be transferred in buckets by a crane or by wheelbarrow. When this is impractical due to the distance required or the size of the job, the fresh concrete can be pumped through a system of pipes or hoses to the site by special concrete pumps. Concrete that is to be pumped has more stringent requirements for workability. If the concrete is too dry, it will not pump well, while if it is too wet it will tend to segregate. Segregation can also occur if the concrete falls into the formwork too quickly, as larger aggregate particles will tend to be driven downward.
Consolidation. Once the concrete is in place, it should be consolidated to remove large air voids developed during placement and to make sure that the concrete has flowed into all of the corners and nooks of the formwork. This process is also called compacting. Overconsolidation can lead to segregation and bleeding, but underconsolidation is more common, resulting in less-than optimal properties. The two most common methods of consolidation are vibration and roller compacting.
Vibration. Vibration is a mechanical process that transfers pulses of shear energy to the concrete, usually by a probe that is inserted several inches into the concrete. Each pulse of shear energy momentarily liquefies the concrete, allowing it to flow very freely. This is the standard consolidating method for general construction projects with the exception of roads. The shear energy will only travel through a limited thickness of concrete, so when a thick concrete structure is being placed, the fresh concrete is poured in layers, with each layer consolidated before the next is poured over it. Vibration is a noisy and labor-intensive step, requiring expensive and specialized equipment. For this reason, there is growing use of self-consolidating concrete which flows so freely (through the use of chemical admixtures) that mechanical consolidation is not needed.
Roller compaction. Roller compaction is a simpler and more cost-effective technique that is suitable for roads and very large mass concrete structures such as dams. A specialized vehicle with a heavy roller on the front is driven over the fresh concrete to drive it into place and remove excess air. The fresh concrete used is very stiff so that it can support the weight of the machine as it passes over. Finishing for concrete floors and pavements, the appearance, smoothness, and durability of the surface is particularly important. Finishing refers to any final treatment of the concrete surface after it has been consolidated to achieve the desired properties. This can be as simple as pushing a wide blade over the fresh concrete surface to make it flat (screeding).
Read and memorize the active vocabulary to the text:
