- •Предисловие
- •Содержание
- •Introduction p. 3
- •Innovation (Part I) p. 80
- •Civil Engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Construction Processes
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part III)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Fundamentals of Reinforced Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Using Concrete Formwork in Construction
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Glass Fiber Reinforced Concrete (gfrc)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •When Stress Is Good:
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Post-Tensioned Slabs
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Why Does Concrete Crack?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Working with Versatile Lightweight Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Fly Ash Concrete?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete Mix with Fly Ash
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Designs – Flexibility and Innovation (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Advantages (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Tilt-up Construction? (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Precast Concrete, Tilt-up Construction and Tiltwall: What's the Difference in These Terms? (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Environmental engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete: a Sustainable Construction Material that can Help Fight Climate Change
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Sustainable Building
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Final tests test I
- •Test II
- •Test III
- •Test IV
- •References to video files
- •The Concrete Construction Process (Part 3)
- •When Stress Is Good:
- •Flexibility and Innovation
- •What's the Difference in These Terms?
- •That can Help Fight Climate Change
- •1. “Sustainable Home”
- •2. “Innovations in Green Home Building”
- •(Heating, ventilating and air conditioning)
- •Glossary of construction terms Construction Terms Beginning With Letter a
- •Construction Terms Beginning With Letter b
- •Construction Terms Beginning With Letter c
- •Construction Terms Beginning With Letter d
- •Construction Terms Beginning With Letter e
- •Construction Terms Beginning With Letter f
- •Construction Terms Beginning With Letter g
- •Construction Terms Beginning With Letter h
- •Construction Terms Beginning With Letter I
- •Construction Terms Beginning With Letter j
- •Construction Terms Beginning With Letter k
- •Construction Terms Beginning With Letter l
- •Construction Terms Beginning With Letter m
- •Construction Terms Beginning With Letter n
- •Construction Terms Beginning With Letter o
- •Construction Terms Beginning With Letter p
- •Construction Terms Beginning With Letter q
- •Construction Terms Beginning With Letter r
- •Construction Terms Beginning With Letter s
- •Construction Terms Beginning With Letter t
- •Construction Terms Beginning With Letter u
- •Construction Terms Beginning With Letter V
- •Construction Terms Beginning With Letter w
- •Construction Terms Beginning With Letter y
- •Construction Terms Beginning With Letter z
- •Библиография
- •Электронные ресурсы
Active Vocabulary
1. formwork опалубка
2. to benefit приносить пользу, помогать
3. durability долговечность
4. to ensure обеспечивать
5. to pour заливать
6. to monitor контролировать
7. plywood фанера
8. to dispose располагать; определять
9. to harden затвердевать
10. releaser разъединяющее средство, материал или вещество
11. bond соединение
12. surface поверхность
13. to accomplish выполнять, завершать
14. unyielding недеформируемый, неподатливый
15. to deteriorate ухудшать, разрушаться
16. cracking растрескивание
17. state-of-the-art современный
18. welding сварка
19. alloy сплав
20. flexibility гибкость
21. to sacrifice жертвовать
22. injury повреждение
Control tests test I
Decide whether these statements are true or false:
1. a). Due to economical way of working with the concrete, it is widely being used as a structural construction material.
b). Due to withstanding compression, bending and tensile stresses, concrete is widely being used as a structural construction material.
c). Due to low cost, strength, durability, and other favorable mechanical properties, concrete is widely being used as a structural construction material.
2. a). To reduce transportation costs and ensure rapid construction, it is essential that the relative humidity level inside the concrete does not drop lower 90%.
b). To reduce transportation costs and ensure rapid construction, it is essential that the concrete is formed according to the requirements at the construction site.
c). To reduce transportation costs and ensure rapid construction, it is essential that the fresh concrete can be pumped through a system of pipes or hoses to the site by special concrete pumps.
3. a). The concrete pressure on formwork should be monitored carefully.
b). The concrete pressure on formwork should eliminate any drag that concrete can cause on the shutters to prevent its free upward movement.
c). The concrete pressure on formwork should ensure that all parts of the slipform shuttering move simultaneously.
4. a). Parting agents are used for retaining the necessary shape by the concrete masses.
b). Parting agents are used for the easy separation of the form materials from hardened concrete.
c). Parting agents are used for leaving inserts for openings like doors and windows.
5. a). The cement quality deteriorates if pools of water are allowed to form on the surface.
b). The cement quality deteriorates if excessive water is used.
c). The cement quality deteriorates if mineral and chemical admixtures are added.
Test II
Match words in columns A and B (synonym match):
A B
1. to benefit a). to accomplish b). to support
c). to suspend d). to enclose
2. favorable a). durable b). special
c). proper d). advantageous
3. carefully a). cautiously b). mainly
c). gradually d). rather
4. waste a). failure b). crack
c). refuse d). effort
5. prevention a). property b). preclusion
c). apprentice d). investigation
6. to affect a). to join b). to exceed
c). to need d). to influence
7. state-of-the-art a). advanced b). strong
c). impressive d). solid
8. to sacrifice a). to award b). contribute
c). to control d). to increase
9. flexibility a). requirement b). resistance
c). distortion d). versatility
10. injury a). transfer b). damage
c). stress d). capacity
