- •Предисловие
- •Содержание
- •Introduction p. 3
- •Innovation (Part I) p. 80
- •Civil Engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Construction Processes
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part III)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Fundamentals of Reinforced Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Using Concrete Formwork in Construction
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Glass Fiber Reinforced Concrete (gfrc)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •When Stress Is Good:
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Post-Tensioned Slabs
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Why Does Concrete Crack?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Working with Versatile Lightweight Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Fly Ash Concrete?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete Mix with Fly Ash
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Designs – Flexibility and Innovation (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Advantages (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Tilt-up Construction? (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Precast Concrete, Tilt-up Construction and Tiltwall: What's the Difference in These Terms? (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Environmental engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete: a Sustainable Construction Material that can Help Fight Climate Change
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Sustainable Building
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Final tests test I
- •Test II
- •Test III
- •Test IV
- •References to video files
- •The Concrete Construction Process (Part 3)
- •When Stress Is Good:
- •Flexibility and Innovation
- •What's the Difference in These Terms?
- •That can Help Fight Climate Change
- •1. “Sustainable Home”
- •2. “Innovations in Green Home Building”
- •(Heating, ventilating and air conditioning)
- •Glossary of construction terms Construction Terms Beginning With Letter a
- •Construction Terms Beginning With Letter b
- •Construction Terms Beginning With Letter c
- •Construction Terms Beginning With Letter d
- •Construction Terms Beginning With Letter e
- •Construction Terms Beginning With Letter f
- •Construction Terms Beginning With Letter g
- •Construction Terms Beginning With Letter h
- •Construction Terms Beginning With Letter I
- •Construction Terms Beginning With Letter j
- •Construction Terms Beginning With Letter k
- •Construction Terms Beginning With Letter l
- •Construction Terms Beginning With Letter m
- •Construction Terms Beginning With Letter n
- •Construction Terms Beginning With Letter o
- •Construction Terms Beginning With Letter p
- •Construction Terms Beginning With Letter q
- •Construction Terms Beginning With Letter r
- •Construction Terms Beginning With Letter s
- •Construction Terms Beginning With Letter t
- •Construction Terms Beginning With Letter u
- •Construction Terms Beginning With Letter V
- •Construction Terms Beginning With Letter w
- •Construction Terms Beginning With Letter y
- •Construction Terms Beginning With Letter z
- •Библиография
- •Электронные ресурсы
Test III
Select the best possible answer out of the choices from the list to the statements (multiple choice):
1. In the case of slipform building, the formwork … .
a. is firmly aligned to the starter with the means of yokes.
b. is installed rigidly to the crossbeams.
c. is erected only once and remains intact until the entire structure is completed.
d. is continually removed to newer locations and then re-erected.
2. It is very important that the entire structure … .
a. can all act simultaneously so that the whole slipform shuttering moves upwards.
b. could have inserts to support floor slabs after the walls are constructed.
c. could have inserts for openings like doors and windows.
d. be such that its rigidity and shape is maintained at all times.
3. …………………… are a very vital part of efficient slipform construction.
a. Accuracy and continual casting for constructing a monolithic structure
b. The design of the working deck and the yokes and horizontal crossbeams
c. The cohesive characteristics between the steel and concrete
d. The rigidity of the supporting platform and availability of lifting equipment
4. Slipform methods of construction can also be adapted to … .
a. building of driveways and sidewalks.
b. finishing of concrete floors and pavements.
c. inserts for openings like doors and windows.
d. horizontal structures such as paving, canals, and tunneling.
5. This allows the shuttering to move easily and eliminates any drag that concrete can cause on the shutters to prevent … .
a. its free upward movement.
b. inclination towards each other at the top.
c. any lag from one part to the other.
d. deflection from the correct alignment.
Test IV
Complete the sentences by filling in the correct word that fits a statement (gap fill). Choose the appropriate words from the word bank given below.
A. yokes B. supporting C. lag D. between
E. simultaneously F. technique G. intact H. thicknesses
I. advantages J. to retain K. pouring L. structures
1. Accuracy and continual casting for constructing a monolithic structure are its greatest …… .
2. The slipform technique of construction allows for the continuous …… of concrete into walls of a structure.
3. The slipform shuttering is then firmly aligned to this starter with the means of …… on each side of the shuttering.
4. The heights of such slipform shuttering will normally be …… 1. 1 meters to 1. 5 meters in height.
5. A major cost of concrete structure construction comes in the form of the required ormwork …… the concrete.
6. The rigidity of the …… platform is also essential so that all parts of the structure move simultaneously.
7. If there is any …… from one part to the other, this can cause the shuttering to drag and make it difficult to be pulled up.
8. It is also possible to reduce wall …… as the construction gains height.
9. Slipform methods of construction can also be adapted to horizontal …… .
10. Hydraulic jacks are installed rigidly to the crossbeams that can all ac …… .
UNIT 8
