- •Предисловие
- •Содержание
- •Introduction p. 3
- •Innovation (Part I) p. 80
- •Civil Engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Construction Processes
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •The Concrete Construction Process (Part III)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Fundamentals of Reinforced Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Using Concrete Formwork in Construction
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Glass Fiber Reinforced Concrete (gfrc)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •When Stress Is Good:
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Post-Tensioned Slabs
- •Active Vocabulary
- •Test II
- •Test III
- •Test IV
- •Why Does Concrete Crack?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Working with Versatile Lightweight Concrete
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Fly Ash Concrete?
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete Mix with Fly Ash
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Designs – Flexibility and Innovation (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Steel Building Advantages (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •What is Tilt-up Construction? (Part I)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Precast Concrete, Tilt-up Construction and Tiltwall: What's the Difference in These Terms? (Part II)
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Environmental engineering
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Concrete: a Sustainable Construction Material that can Help Fight Climate Change
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Sustainable Building
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Active Vocabulary
- •Control tests test I
- •Test II
- •Test III
- •Test IV
- •Final tests test I
- •Test II
- •Test III
- •Test IV
- •References to video files
- •The Concrete Construction Process (Part 3)
- •When Stress Is Good:
- •Flexibility and Innovation
- •What's the Difference in These Terms?
- •That can Help Fight Climate Change
- •1. “Sustainable Home”
- •2. “Innovations in Green Home Building”
- •(Heating, ventilating and air conditioning)
- •Glossary of construction terms Construction Terms Beginning With Letter a
- •Construction Terms Beginning With Letter b
- •Construction Terms Beginning With Letter c
- •Construction Terms Beginning With Letter d
- •Construction Terms Beginning With Letter e
- •Construction Terms Beginning With Letter f
- •Construction Terms Beginning With Letter g
- •Construction Terms Beginning With Letter h
- •Construction Terms Beginning With Letter I
- •Construction Terms Beginning With Letter j
- •Construction Terms Beginning With Letter k
- •Construction Terms Beginning With Letter l
- •Construction Terms Beginning With Letter m
- •Construction Terms Beginning With Letter n
- •Construction Terms Beginning With Letter o
- •Construction Terms Beginning With Letter p
- •Construction Terms Beginning With Letter q
- •Construction Terms Beginning With Letter r
- •Construction Terms Beginning With Letter s
- •Construction Terms Beginning With Letter t
- •Construction Terms Beginning With Letter u
- •Construction Terms Beginning With Letter V
- •Construction Terms Beginning With Letter w
- •Construction Terms Beginning With Letter y
- •Construction Terms Beginning With Letter z
- •Библиография
- •Электронные ресурсы
Active Vocabulary
slipform construction строительство (железобетонных) сооружений с использованием скользящей опалубки
pre-stressed предварительно напряжённый
casting литье, отливка
to reduce уменьшать, сокращать
2. pouring заливка, разливание
3. to remain оставаться
4. intact неповрежденный, целый
5. re-erected вновь возведенный
6. shuttering опалубка, ставень, затвор
7. to impose налагать, заключать, спускать
8. alignment выравнивание
9. yoke (здесь) скоба, хомут
10. crossbeam поперечная балка
11. rigidly жестко, прочно
12. to connect соединять
13. inclined наклонный
14. dimension измерение, размер
15. to eliminate ликвидировать, устранять
16. to cause вызывать, причинять
17. to drag тянуть, тащить
18. arrangement расположение, установка
19. pier (здесь) столб
20. insert вставка; вставлять
21. upward вверх
22. lag задержка; задерживать
CONTROL TESTS
TEST I
Decide whether these statements are true or false:
1. a). The slipform method is an efficient way of working with concrete because it reduces the overall construction time considerably.
b). The slipform method is an efficient way of working with concrete because a major cost of concrete structure construction comes in the form of the required formwork.
c). The slipform method is an efficient way of working with concrete because the formwork is erected only once and remains intact.
2. a). The slipform technique of construction allows the formwork to be continually removed to newer locations.
b). The slipform technique of construction allows for the continuous pouring of concrete into walls of a structure.
c). The slipform technique of construction allows the formwork to remain intact.
3. a). A slipform assembly can only start after the formwork is established and re-erected.
b). A slipform assembly can only start after the yokes are all connected by horizontal crossbeams.
c). A slipform assembly can only start after the foundations of the walls have been correctly laid.
4. a). The slipform shuttering is then firmly aligned to the starter by horizontal crossbeams.
b). The slipform shuttering is then firmly aligned to the starter with the means of yokes.
c). The slipform shuttering is then firmly aligned to the starter with the means of hydraulic jacks.
5. a). It is normal for the two sides of the shuttering to be inclined towards each other at the top.
b). It is normal for the two sides of the shuttering to be installed rigidly to the crossbeams.
c). It is normal for the two sides of the shuttering to move upward freely.
Test II
Match words in columns A and B (synonym match):
A B
1. advantage a). innovation b). benefit
c). protection d). transmission
2. continual a). excessive b). hollow
c). particular d). permanent
3. considerably a). greatly b). accurately
c). actually d). fully
4. to eliminate a). to decide b). to exchange
c). to liquidate d). to analyze
5. alignment a). estate b). masonry
c). length d). leveling
6. simultaneously a). concurrently b). safely
c). independently d). quickly
7. vital a). solid b). essential
c). specific d). single
8. available a). final b). usual
c). visual d). accessible
9. entire a). total b). professional
c). stable d). static
10. in advance a). in private b). beforehand
c). in particular d). notably
