- •Gold mining
- •Text 1. Some facts from the history of gold mining
- •Diamond Placer
- •Text 3. La paz placers
- •Text 2. Placer mining вy excavating machinery
- •Fig.1. Ruston-Bycyrus dragline excavator
- •Fig. 2. Dragline making first cut
- •Fig.5. General arrangement of property for dragline mining
- •Text 3. Power shovels
- •Cableways
- •Text 4. Excavating equipment in тнe mid 80s
- •Electric mining shovels
- •Hydraulic excavators
- •Fig. 13. Ransomes and Rapier w2000 walking dragline stripping overburden at phosphate mine in Jordan
- •Fig. 14. Shows the rh120c introduced in 1933 as an intermediate size between the rh75 and rh300, incorporating “Tripower" geometry
- •Text 2. Dredging in the north
- •Stripping
- •Dredging
- •Vocabulary
- •Text 3. Thawing
- •Other operating problems
- •Nodules
- •20° Angle Gave Best Results
- •Fig. 17. Nodule dredge configuration shown was chosen after a series of increasingly complex dredge designs
- •Larger Dredge Lines Cause Problems
- •Dredge Vessel Specifications
- •Ship Positioning By Dead Reckoning
- •10 Tpd Average
- •Fig. 18. Stages in mining diamondiferous gravel
- •Transport
- •Milling
- •Effects
- •What is Cyanide?
- •Prevention/Solution
- •Text 2. Sluicing
- •Sluice Boxes
- •Water Required
- •Tailings
- •Text 3. Excavation and treatment of gravel
- •Fig. 29. Sluicing by direct loading method
- •Fig. 30. Method of working with ample water supply and steep valley
- •Text.2 working of terrace and alluvial deposits
- •Fig. 33. Method of working river terrace and eluvial deposits
- •Fig. 34. Example of exploitation plan
- •Text 2. Hydraulic mining
- •Fig. 35. Sketch of giant or monitor
- •Text 3. Hydraulic elevators
- •Fig. 41. Hendy hydraulic gravel elevator
- •Fig. 42. Section of elevator pit (Joshua Hendy Iron Works)
- •Text 4. Sluice boxes for hydraulicking
- •Text 2. Miscellaneous methods of mining
- •Text 3. Khetri copper complex
- •Text 4. Kherti and kolihan mines
- •Fig. 46. Longituainal section of Kherti mine, showing principal shafts, main levels and stoping areas
- •In Kolihan mine, small footwall ore-shoots are worked by a sub-level top-slicing method using jackhammers and remote controlled Cavo loaders.
- •Shafts at the Kherti and Kolihan mines
- •Fig. 48. The service shaft, Khetri mine
- •Central services
- •Personnel and housing
Fig. 46. Longituainal section of Kherti mine, showing principal shafts, main levels and stoping areas
Blasting is by ANFO, with the priming using anodets and 20 g primer cartridges plus PETN booster charges in the column.
Recently large diameter blast hole stoping has been successfully introduced in Kolihan mine using a Mission Mega-drill to put in 150 mm/l64mm diameter holes in an open stoping method which eliminates the need for sub-level development. This has enabled a 40% reduction to be made in necessary development, and brought about a 30% reduction in stoping costs and a 50% reduction in stope preparation time. The method is likely to be progressively introduced throughout both mines.
Broken ore from the sub-level stope is extracted through cross-cut draw points, using rocker shovels on tracked levels and LHD's on trackless ones.
In Kolihan mine, small footwall ore-shoots are worked by a sub-level top-slicing method using jackhammers and remote controlled Cavo loaders.
Overall extraction оf ore is 70%, the balance being left in crown, sill and stope pillars. Dilution is 5%; the stopes are worked to an assay contact, but some over-drilling is practiced in the hanging wall to reduce ore losses in blast-hole toe sockets.
Shafts at the Kherti and Kolihan mines
Mine |
Kherti |
Kolihan |
||
Shaft |
Production |
Service |
No: 3: Inckline |
Production/Service |
Collar clevation (m)
Depth (m)
Cross-section
Use
Levels served
Loading levels
Skips
Cages
Guides
Shaft lining
Hoist type
Hoist kw |
390
475,5
5,5 m dia
Ore hoist/Vent. return
-
0 m
2 x 14 t
-
8 ropes
Concrete
Koepe winder
2,870
|
370
388,4
6,1 m x 4,93 m
Waste hoist/Vent.intake/Services 300, 240, 180, 120, 60
180,0
-
2 x 2 deck
Rails
Concrete
Double-drum winder
1,600 |
374
194
-
Waste hoist/Services
350, 300, 240, 180
300
1 x 2 t
-
Track
Uneined
Single-drum winder
150
|
424
270
5,90 m dia
Ore/Waste hoist/Vent. intake/Services 306, 246, 229, 200, 184 246, 184
2 x 6 t
2 x 1 deck
Rails
300 mm concrete
Koepe (skips) Double-drum 2,900 |