 
        
        - •Test questions for discipline «Architecture-1» Speciality: 5b072900- "Construction". For 2014 academic year.
- •Placing an order is
- •The tender documentation is
- •State capital investments
- •State centralized capital investments
- •Mixed capital investments
- •Construction it is-
- •Launch Complex
- •Construction project
- •Design is conventionally divided into
- •Economic effect compared alternatives of building structures calculated by the formula
- •Calculation of economic benefit, is performed by the formula
- •Ratio is the overall efficiency for the enterprise
- •Effect in the production
- •Production of construction industry
- •Construction as a sector of the economy involved...
- •Investor —
- •Continuous visual inspection of structures and identification of external signs of damage. Continuous visual inspection of buildings and identification of external signs of damage.
- •Investors have ...
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •The customer is ...
- •Familiarization with the technological map of the building.
- •The builder is different ....
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •Main contractor
- •Scheme and the statements of defects and damages with fixing their places and nature. Descriptions, drawings, photographs of defective sites.
- •Organizational forms of construction:
- •Only solid.
- •Incomplete.
Launch Complex
A collection of objects (or parts thereof) of the main, auxiliary and service purposes, energy, transport and warehousing, communications, etc. that provide the output, provided by the project.
A set of measures to ensure the loading capability of buildings and structures.
A set of measures to ensure a weakening of buildings and structures.
A set of measures liquidation of buildings and structures.
Set of measures for the destruction of buildings and structures.
2
Filling cavities outside performed after
9
Assembly and welding of overlap and perform vertical waterproofing.
Manual soil excavation.
Bedding sand bed.
Horizontal isolation.
Installation of the first row of building blocks.
3
Leading the construction process is the above-ground parts of the building
9
Framework assembly (or masonry).
Electrical works.
Plumbing works.
Decoration works.
Landscaping.
1
Construction project
3
Separate building or structure, for construction, renovation or expansion for which must be made a separate project and budget.
Complex of measures to ensure the reduction of the carrying capacity of buildings and structures.
Complex of measures to ensure the easing of buildings and structures.
Set of all activities liquidation of buildings and structures.
Set of all activities related to the destruction of buildings and structures.
1
Design is conventionally divided into
3
Three stage.
Materials from which were made the main load-bearing structures.
Overlap and cover.
Foundations and foundation beams.
Columns and walls.
2
Economic effect compared alternatives of building structures calculated by the formula
3
Э = ((З1 + ЗС1 ) + ЭЭ - (ЗС2 + З))*А2
Brand materials, which are made of construction.
The thermal conductivity of the materials from which the structures are made.
Reliability of the materials from which made the design.
The materials from which the structures are made.
2
Calculation of economic benefit, is performed by the formula
3
Э = В * Y Zmi=1 З1i * Lt + Ээ – Zni=1 З2i * Lt
Э = R * Y Zmi=1 З1i + Ээ =1 З2i * Lt
К = Ц- С/К.
К = Ц- 2С/К.
The results of a detailed examination.
2
What amount of broken bricks (half brick) in percentage are allowed during supplying ordinary ceramic bricks
14
Not more than 10 %
Not more than 5%
Not allowed.
Not more than 0,1 %
Not more than 0,5 %
3
What is the minimum amount of floor slabs bearing on the load-bearing walls, made by hand, brick and stone buildings in seismic areas
14
Not less than 180 mm.
Not less than 120 mm.
Not less than 100 mm.
Not less than 120 mm.
Not less than 70 mm.
4
Ratio is the overall efficiency for the enterprise
3
Кre enterprise = Ц- С/К
Э = R * Y Zmi=1 З1i + Ээ =1 З2i * Lt
Э = В * Y Zmi=1 З1i * Lt + Ээ – Zni=1 З2i * Lt
Only in emergency condition.
Only in an invalid state.
2
Effect in the production
3
Эсф.р-ва = Эд.ввода в эксп. + Эвысв.ОПФ
Allowed in establishing additional fixings.
Allowed after repairs.
Эсф.р-ва = К.п.д.выхода в эксп. + Эрез.в.
Allowed after checking its suitability.
2
In what areas should be carried out anti-corrosion coatings of insert plates and connecting precast concrete products
17
At the discretion of the Executive.
In all areas.
In all places where during the installation and welding, broken the factory coating.
At the option of the customer.
At the option of the designer.
2
Which of the following physico-mechanical properties of PVC linoleum on the underlying cause of tissue set guideline values
17
Linear Measurement, %
The bond strength between the protective layer of the obverse and the next film layer, N/sm.
Electrical surface resistivity, Om.
Abradability, mkm.
Absolute permanent deformation, mm.
2
