 
        
        - •Test questions for discipline «Architecture-1» Speciality: 5b072900- "Construction". For 2014 academic year.
- •Placing an order is
- •The tender documentation is
- •State capital investments
- •State centralized capital investments
- •Mixed capital investments
- •Construction it is-
- •Launch Complex
- •Construction project
- •Design is conventionally divided into
- •Economic effect compared alternatives of building structures calculated by the formula
- •Calculation of economic benefit, is performed by the formula
- •Ratio is the overall efficiency for the enterprise
- •Effect in the production
- •Production of construction industry
- •Construction as a sector of the economy involved...
- •Investor —
- •Continuous visual inspection of structures and identification of external signs of damage. Continuous visual inspection of buildings and identification of external signs of damage.
- •Investors have ...
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •The customer is ...
- •Familiarization with the technological map of the building.
- •The builder is different ....
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •Main contractor
- •Scheme and the statements of defects and damages with fixing their places and nature. Descriptions, drawings, photographs of defective sites.
- •Organizational forms of construction:
- •Only solid.
- •Incomplete.
The tender documentation is
2
Complex of documents that contain information about the subject of the order.
Documents that meet the conditions of competition, it is sufficient for the preparation of the offer at a certain time.
Complex of documents that contain information about the contract.
Complex of documents that contain information about the condition of the building as a whole, which led to the destruction.
Complex of documents that contain state of the structure as a whole.
3
To control the preservation of property and verify their account periodically held in warehouses
12
Inventory.
Registration.
Accounting.
Control.
Audit.
3
Turnover of warehouse goods is determined
12
Amount of recycled materials and products in tons per year, quarter, month, taking into account the range of materials, complexity of their warehouse processing and money.
By inventory.
By accounting.
By audit.
By registration.
3
Tender Committee (Commission)
2
Permanent or temporary body; created for the preparation and conduct of the contest.
The condition of building material.
Category of the physical condition of the structure.
Permanent body created for the preparation and conduct of the order.
Category of mechanical condition of the structure.
4
What is the frequency of inspection is crushed stone and gravel at the factory
14
Every 12 hours.
Twice a day.
Once a week.
Once a day.
Once a month.
1
What is Quality Score checked during periodic testing concrete wall stones once in 10 days.
14
Frost resistance and thermal conductivity.
Thermal conductivity.
Frost resistance.
Average density.
Humidity.
2
What includes the concept of "contracting bids»
14
Choosing a contractor to perform work.
Selecting a contractor to perform work on the basis of competition.
Selecting a designer.
Selecting a client.
Selecting a builder.
1
For which of the following quality indicators established guideline values for roofing material
16
As per Weight of coating composition.
As per water absorption.
As per frost resistance.
As per hygroscopicity.
As per mpact properties.
1
In developing the schedule after selecting methods of production work is performing
16
Counting the complexity and machine capacity works.
Counting the amount of work.
The scaling works.
Determination of performance time.
Determination the number of shifts.
2
Whether a customer refuse to supply materials for the construction of the facility and request a refund of the amount of money in case of critical defects
16
Yes, have the right to.
Not entitled to.
In agreement with the formen.
In agreement with the worker.
In agreement with subcontractor.
3
How to mount the slabs (flat and hollow flooring) in frame buildings and structures
18
It should be laid on a thick layer of the solution not exceeding 30 mm.
It should be laid on a thick layer of the solution not exceeding 40 mm
It should be laid on a thick layer of the solution not exceeding 65 mm.
It should be laid on a thick layer of the solution not exceeding 70 mm.
It should be laid on a thick layer of the solution not exceeding 100 mm
1
It allowed consumers to supply ordinary ceramic bricks with unburnt carbon burnout or, if permitted, at what percentage of the party volume
18
Not allowed.
Allowed.
Allowed at the discretion of customer.
Allowed at the discretion of suplier.
Allowed at the discretion of manufacture.
1
