Placing an order is

1

The process of selecting partners for the execution of the contract and approval of its provisions.

Activities selection of partners for the contract performing.

The process of selecting partners for the execution of the order.

Category of technical condition of const-struction, which led to its destruction.

The state of the building structure, which led to the destruction of building.

3

The project is implemented on the basis of

1

Design assignment.

Matrix-table.

Win system.

Position "Quality -First of all"

ISO 9000

2

The basic principle of design

1

Variance.

Reducing the cost of set-up.

Use of reserve stocks.

Increase labor morale.

Improve product designs.

2

During two-stage design develop

1

Projects and documentation.

Working project.

Methods labor.

Forms of production organization.

Function sequences.

1

What is the qualification of workers

4

Shows the level of theoretical and practical skills.

The type and nature of the work.

Kind of employment within a profession.

This is the amount of the tariff rate.

This is worker specialty.

1

Where established nomenclature of trades, professions and skills of construction workers

4

One wage-rate catalog.

SNIP, VNIR

ENIR

GOST, TC.

MNIR

2

How many workers is in integrated team, and what they perform

4

50-60 workers in different occupations and professions and perform complex processes. The foreman of the skilled workers are lower than 4 lewel leading specialty

Of the 30 workers who perform the processes associated with the zero cycle.

Of the 10 workers who perform work on installation of plumbing systems.

Of the 90 workers perform only civil works.

Of the 10 workers perform the processes associated with the finishing works.

3

In determining the need for the construction of water must be considered

7

Water supply production processes (masonry, forming a solution, concrete works etc.), household and fire needs

Construction general plan dimensions.

Dimensions of structures.

Construction site dimensions.

Construction volume of building.

2

Temporary water network suit

7

From steel pipes diametr 25-150 mm.

From steel pipes with diameter 5 mm.

From steel pipes with diameter 350 mm.

From steel pipes with diameter 450 mm.

From steel pipes with diameter 100 mm.

2

Electricity demand is determined for construction site

7

Level of mechanical energy armament and labor

Construction general plan dimensions.

Construction volume of building.

Volume of construction building.

Construction site dimensions.

2

Work that perform workers, owning a second profession, for example: welder

9

nstallation of prefabricated buildings, welding works, installation of metal fencing, lifting works.

Masonry work, plastering works.

Transport works

Bitum preparing.

Concrete pouring.

3

The technological sequence of works influenced by

9

specific design decisions, year period, the construction area

Work, dependence, and the expectation of an event.

Profit.

Combination of professions.

Graphics requirements for personnel, material and technical resources.

1

The main method of shortening the construction is

9

Thread - parallel and combined construction and installation works.

Sequential.

Line.

Scheduling.

рациональные решения по организации земляных работ

1

For images of works which are executed in parallel and have a common start and end events are entered

11

Dependence and additional events,

Marks.

Three-way arrows.

Designate a double circle.

Roman numerals.

3