- •Test questions for discipline «Architecture-1» Speciality: 5b072900- "Construction". For 2014 academic year.
- •Placing an order is
- •The tender documentation is
- •State capital investments
- •State centralized capital investments
- •Mixed capital investments
- •Construction it is-
- •Launch Complex
- •Construction project
- •Design is conventionally divided into
- •Economic effect compared alternatives of building structures calculated by the formula
- •Calculation of economic benefit, is performed by the formula
- •Ratio is the overall efficiency for the enterprise
- •Effect in the production
- •Production of construction industry
- •Construction as a sector of the economy involved...
- •Investor —
- •Continuous visual inspection of structures and identification of external signs of damage. Continuous visual inspection of buildings and identification of external signs of damage.
- •Investors have ...
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •The customer is ...
- •Familiarization with the technological map of the building.
- •The builder is different ....
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •Main contractor
- •Scheme and the statements of defects and damages with fixing their places and nature. Descriptions, drawings, photographs of defective sites.
- •Organizational forms of construction:
- •Only solid.
- •Incomplete.
Test questions for discipline «Architecture-1» Speciality: 5b072900- "Construction". For 2014 academic year.
The language of instruction – English. Semester – 3
2 nd. Course. Groups СТЭ-21; 22. ПГС-21; 22.
Responsible for Test development: teacher Raskaliyev A.T.
Item.
The level of complexity.
Question.
Section.
Topic
Answer А)
(correct)
Answer В)
Answer С)
Answer D)
Answer Е)
1
The main regulatory document for the organization of the construction is
1
SNIP 3.01.01-85 * "Organization of construction production"
SNIP 2-40-80 "Metropolitan"
SNIP 2-44-78 "Tunnel"
SNIP 2.05.03-84
"Bridges and pipes"
SNIP 3.02.01-87 "Earthworks and Foundations "
2
During organizing, planning and construction management got a visual model.
1
a)Line schedule.
b)Sequence diagram.
c)Network Diagram
d) Tables-matrix.
a)Cybernetic
b)Stochastic
Mathematical
Heuristic
Economics
1
Design and development work is done on the basis of
1
Agreement (contract) at agreed prices.
Cyclograms
ISO 9000
Win Estimates
Tables-matrix.
2
How contracts are classified according to the method of pricing
3
Fixed price contract and a contract with costs
Traditional subcontracting contract.
Contract "design-build"
Contract for construction management.
Contract for project management.
2
How contracts are classified by the nature of relations between the project participants and the division of responsibilities between them
3
Traditional subcontracting contract, the contract "design-build", contract for construction management, contract management.
Fixed price contract.
Contract with costs.
Applicants providers.
Fixed price contract and a contract with costs.
2
List of construction material and technical resources
4
Building materials, design, details, construction machines, machinery, equipment, accessories and tools.
Standard and individual construction projects.
The choice of methods of installation and assembly of building construction.
Development of JPP, drawing construction schedule.
Drawing up of orders processing plant.
2
What is a profession and specialty construction worker
4
The type and nature of the work;
kind of employment within a profession.
This is assignment to worker accordance with working level skills.
This level of theoretical skills.
This level of practical skills.
This category of construction worker.
3
The existence of two entrances to the site, if the section is
7
More than 1 km.
More than 0,85 km.
Less than1 km.
More than 0,61 km.
More than 0,1 km.
3
The width of the one way road is
7
3,5 m
2,0 m
1,5 m
0,90 m
1,8 m
4
Fire breaks between combustible buildings is
7
20,0 m
10,0 m
15,0 m
3,0 m
11,0m
2
The main indicator of quality assessment system master plan
7
Built-up area.
Construction coefficient.
Costs for temporary buildings.
Safe operations.
Technical Report
1
Subject of order
9
Work which provides order.
Category of technical condition, in which the quantitative value of the parameters do not meet regulatory requirements.
Work that provides for the implementation of.
Work which provides the normative document.
Structures condition do not meet the requirements of the CP.
1
With a slight amount of work for any profession does not provide a full load in the billing period, scheduled
9
Combination of professions.
Vacation.
Leave without pay.
Moved to another site.
Short vacation.
1
The duration of the construction of residential and public buildings is determined
9
SNIP1.04.03-85* "Norms and duration of construction backlog in the construction business buildings and facilities"
SNIP ROK1.02-18-2004 "Engineering surveys for construction and design"
CP11-101-95
"The order of development, coordination, approval and composition studies of investment in the construction of enterprises, buildings and facilities"
GOST21.002-81
SDDS Normative control of construction documents.
SNIP1.03-05-2001
Occupational health and safety in construction.
2
The main elements of the network schedule are
9
Work, dependence, expectation and event.
Uneven movement of workers.
Flow.
Income .
Single order.
4
Early initiation of work and its designation
11
This
is the earliest date when you can start the work; denoted
ti-jр.н
This is the earliest date when you can finish the work; denoted ti-jр.н
It is the later date when you can start the work; denoted ti-jр.н
It is the later date, when you can finish the work; denoted ti-jр.н
This time reserve.
2
When building a network, observe the following rules
11
All the arrows (arcs) work should be directed from left to right in the direction of developing the schedule to the final event.
All the arrows (arcs) work should be directed from right to left in the direction of developing the schedule to the final event.
All the arrows (arcs) work should be directed upwards towards developing graphics to the final event.
All the arrows (arcs) work should be directed downward toward developing graphics to the final event.
All the arrows (arcs) work should be directed downwards.
1
On material received from the supplier storekeeper issued
12
Credit order or acceptance certificate.
Act on the hidden work.
Report.
Timesheet.
Receipt.
1
The most rational method of accounting for tangible assets is
12
Operational and accounting.
Registration.
Control.
Record.
Inventory.
2
During operational accounting used
12
Special control cards and registry materials delivery of documents.
Work log.
Technical Reports.
Inventory.
Record.
2
Open storage massive construction materials transmitted
12
To performing authority or formen under the trust receipt and recorded his accountability.
To worker.
To designer.
To quality control.
To engineer-controller.
3