  1. Match the words combinations with their translations.

manmade structure

inspiration of building design

patterning system

buried more than 50 m deep

corrosive chemicals

cooler concrete mixture

project in jeopardy

choreograph different lighting sequences

прототип внешнего вида здания

коррозийное химическое вещество

охлажденная бетонная смесь

реализация проекта под угрозой

структура, созданная руками человека

система компоновки узоров

установленный на глубине 50 метров

театрализованное представление с использованием разных видов подсветки

  1. Insert the necessary wh-question word into each gap. Take turns asking and answering questions with your partner.

  1. … the height of Burj Khalifa building?

  2. … was Burj Khalifa construction completed?

  3. … the reason for Burj Khalifa construction from the economic point of view?

  4. … was the inspiration of building design taken from?

  5. … … concrete was used to construct the concrete and steel foundation?

  6. … the diameter of each pile?

  7. … was used under the mat is used to minimize any detrimental effects from corrosive chemicals in local ground water?

  8. … … cranes was used to lift loads?

  9. … was concrete poured at night?

  10. … was added to the concrete mixture?

  11. … could put the project in jeopardy?

  12. … was the opening of Burj Khalifa held?

  13. .. fireworks did the ceremony of opening feature?

  14. … were the lights integrated?

  1. Can you translate into English without a dictionary?

  1. Бурдж Калифа самое высокое здание сделанное руками человека.

  2. Здание было построено Южно-корейской строительной фирмой.

  3. Фундамент здания имеет 134 сваи.

  4. Температура воздуха в Персидском заливе может достигать +50 градусов.

  5. В бетонную смесь добавлялся лед.

  6. Бетон заливался ночь.

  7. На стене здания много трещин.

  8. Во время церемонии открытия было использовано около 5 000 фейерверков.

  9. Высота здания составляет 400 метров.

  10. Весь бетон был тщательно проверен.

  11. Диаметр сваи составляет 1 метр.

  12. Длина сваи составляет 33 метра.

  1. Give a short background information about Burj Khalifa. Present a short monologue about its construction using it.

Height ____________________________________

Date of complition _____________________________

Architect __________________________________

Number of piles _______________________

Diameter of piles ______________________

Length of piles ________________________

Number of cranes _________________________

Volume of concrete _______________________

Concrete mixture _________________________

Environmental conditions __________________

  1. Watch the video ads about Wes Adams Construction and Max Smith Concrete Construction companies and answer the questions.

  1. Which company specializes in construction of storage facilities?

  2. Which company specializes in foundations, parking lots, driveways and sidewalks construction?

  1. Insert the gaps using the words in the box. Watch the video and check your answers.

concrete layer university see traditional construction complexity components

Concrete Printing: An Innovative Construction Process

T he introduction of highly sophisticated computing modelling technologies has meant that designing of shape and form of a building is now only limited by an architect’s imagination.

Leading architectural practices such as Foster&Partners are designing building to a level of geometrical _____ unheard 10 years ago. However all these forms can often be achieved through off set factory-based manufacturing techniques there are significant limits to levels of intricacy attainable. For example, pouring ______ into a framework can go some way to fulfilling these ambitions but the reality is that the achievable complexity is still limited.

The manufacturing process is required to turn these complex building designs into reality have remained elusive until now. This may be changed if current research by scientists of Loughborough ______ becomes common usage. The research has been inspired by 3-d printing and additive manufacturing process. Here information created from computer generated models is exported to the machine which then builds up a model or a component layer by ______. The virtual model is in fact materialized. Having modified cement and using powder and glue they are experimenting with concrete large-scale building components.

X avier De Kestelier, Assosiate Partner, Forster+Partners: “The research of Loughborough University gives the strain of opportunities. They are able to have a real ticket to the future to see what the building _______ will be in the next 5 or 10 years”.

Concrete printing works on a basis of a highly controlled intrusion of cement-based motor which is precisely positioned according to computer data. The process has the potential to create architecture which is more unique in form but crucially components do not have to be made of solid material and so can use resources more efficiently than _______ techniques.

Professor Simon Austin, Co-Investigator, Loughborough University: “We have large structures panels or walls with precisely controlled voids within them. For example, the section which you can _______ has been manufactured here could incorporate all the service requirements of a building such as pipes and cables in one unit”.

T his process is capable of producing building _______ to the degree of customization that has been seen yet and could create an architecture adaptive to the environment and fully integrative to its engineering function.

Imagine whole sections of a building being _______ and then assembled on the site with a service provision already installed. Above all, imagine a building with form and scale could take on limitless possibilities.

DISCISSION

  1. Describe the graph showing the volume of concrete market in Russia in 2009-2011.

Volume of Concrete Market in Russia (mln,m³)

Concrete

Mortar

PROJECT WORK

  1. Choose a topic and make a presentation.

  1. The 5-top largest modern concrete bridge structures.

  2. The 5-top largest sport stadium structures.

  3. The 5-top highest modern skyscrapers.

  4. The 5-top largest recreational facilities.

  5. The 5-top longest highways.

  6. The 5-top largest drainage systems.

  7. The 5-top largest dams.